Illicit Discharge - Construction

Stormwater runoff from construction activities can have a significant impact on water quality. As stormwater flows over a construction site, it can pick up pollutants such as sediment, construction debris and chemicals and can transport these pollutants into nearby storm sewer systems or directly into wetlands, rivers, lakes, streams, and coastal waterways. Polluted stormwater runoff can contain nutrients that can lead to excessive plant growth resulting in an increase in the demand for oxygen. The oxygen used by an overabundance of plants can reduce the available oxygen for fish and can lead to fish kills. Pollutants in natural systems can also poison or otherwise harm wildlife that may rely on these water resources. Sedimentation can destroy aquatic habitat, and high volumes of runoff can cause stream bank erosion. Debris can clog waterways and storm sewer structures resulting in localized flooding.

Best Management Practices to control pollution on construction sites fall into three general categories:

Reducing Soil Erosion

Careful land grading, preserving natural vegetation where possible, clearing in phases, the use of physical or chemical barriers to prevent windblown soil, seeding and sodding, and the creation of stormwater diversion channels and settling basins can reduce the movement of loose soil by both wind and water.

Controlling Runoff

Creating temporary or permanent diversions of stormwater into retention or detention areas can keep untreated stormwater from leaving the construction site and out of nearby stormwater systems or natural water bodies and wetlands.

Controlling Sediment

Installing silt fences, turbidity booms, storm drain filters and barriers, sediment basins, traps, and filters, and stabilized construction site entrances are some of the methods used to stop soil from being transported off the construction site by vehicles, wind, or stormwater runoff.

The operator of a regulated construction site must obtain an NPDES stormwater permit and implement a Stormwater Pollution Prevention Plan (SWPPP) to properly manage runoff so that erosion and sedimentation are minimized. The Construction Generic Permit for Stormwater Discharge From Large and Small Construction Activities is issued by the Florida Department of Environmental Protection (FDEP), under the authority of Section 403.0885, Florida Statutes (F.S.), which is the provision authorizing the State to implement the NPDES program. Under Palm Coast's Section 24-205 in the Code of Ordinances, "No discharge to the City's stormwater system ("MS4") shall be permitted to impair the operation of the MS4 or contribute to the failure of the MS4 to meet any local, state, or federal requirements, including, but not limited to, NPDES permits." That section of the code also states, "It shall be unlawful for any person to drain, deposit, place or otherwise discharge pollutants into any stormwater system within the City, or cause or permit to be drained, deposited, placed or otherwise discharged into such stormwater systems, any organic or inorganic matter which causes pollution, pursuant to the water quality standards established by all applicable regulatory agencies."